Skip to content

GCP Migration Services for Business Applications and Infrastructure

Planning to migrate to Google Cloud? MoreYeahs' GCP migration services move applications, servers, databases and data to Google Cloud in planned phases: assess what you run, map dependencies, choose a strategy for each workload, build a secure target environment, migrate and test, then tune.

Trusted by teams in the USA, UK, Australia and India

  • Prometheus
  • Flyers Soft
  • Abdo
  • Supersourcing
  • TerraSecure
  • Devlabs Technology
  • Microsoft Solutions Partner
  • Salesforce ISV Partner
  • AWS Advanced Tier Services Partner
  • Google Cloud Partner
  • Zoho Authorized Partner
  1. 3separate environments on GKE: dev, staging and productionReal estate platform moved from legacy VMs in phases
  2. 6migration strategies, chosen workload by workloadRehost, replatform, refactor, repurchase, retire and retain
  3. 7GCP migration servicesFrom assessment to post-migration optimization
  4. 6stages in our Google Cloud migration processDiscovery to post-migration optimization

What we move to Google Cloud

Not every workload should move the same way. Pick one to see what the move usually involves.

Servers and infrastructure

Virtual machines moved to Compute Engine, with storage, networks and connectivity set up and validated.

What we usually build

  • VMs moved to Compute Engine
  • Storage and network setup
  • Connectivity through VPC, VPN or Interconnect
  • Environment setup and validation

Our GCP migration services

From the first assessment to tuning after cutover, with the right approach for each workload.

01

Google Cloud Migration assessment and planning

Inventory, dependency mapping, readiness, risks, target architecture and wave priorities, with a roadmap and wave plan.

Learn more
02

Google Cloud Migration for infrastructure and workloads

VMs to Compute Engine, storage, networks and connectivity through VPC, VPN or Interconnect, set up and validated.

03

Google Cloud Migration for applications

Discovery, dependency and compatibility checks, configuration changes, deployment and testing.

04

Google Cloud Migration for databases

Assessment, compatibility, schema mapping, replication, validation and performance testing for Cloud SQL or AlloyDB.

05

Google Cloud Migration for data

Source assessment, mapping, transfer, quality checks and reconciliation.

Learn more
06

Google Cloud Migration with modernization

Containerizing apps onto GKE or Cloud Run, with CI/CD and autoscaling, only where it is worth it.

07

Google Cloud Migration with post-migration optimization

Functional and data checks, security review, monitoring, utilization and cost review.

Learn more

Our Google Cloud migration process

Sequencing depends on scope. Each migration wave repeats execution and testing before the next one starts.

Plan your project
  1. 01

    Discovery and assessment

    Your goals, infrastructure, apps, dependencies and constraints.

  2. 02

    Strategy and roadmap

    Workloads classified, a strategy picked for each, migration waves set, the target defined and risks listed.

  3. 03

    Architecture and preparation

    Networks, IAM and the landing environment built as code, plus data protection and validation plans.

  4. 04

    Migration execution

    Apps and data moved wave by wave, with dependencies and configuration managed along the way.

  5. 05

    Testing and validation

    Function, data integrity, security and access are tested, then the business signs off. Each wave repeats execution and testing.

  6. 06

    Post-migration optimization

    Performance, utilization and configuration tuned, with ongoing support where agreed.

What your workloads land on in Google Cloud

Compute Engine, GKE or Cloud Run depending on the app, inside a secure landing environment built before the first wave, with monitoring in place after cutover.

  • GKE
  • Cloud Run
  • Private VPC and NAT
  • Firewall rules
  • Load balancing
  • IAM
  • Terraform
  • CI/CD
  • Cloud Monitoring
  • Prometheus and Grafana

Why MoreYeahs for Google Cloud Migration

A partner that delivers, then stays to support what it built.

01

Phased VM-to-GKE migration

A real estate platform moved off legacy VMs to GKE in stages, with old infrastructure retired after validation and production kept stable.

  • GKE
  • CI/CD
  • Autoscaling
  • Observability
02

Secure landing environments

Private VPCs, NAT, firewall rules, load balancing and IAM, built with Terraform before the first wave.

  1. 01Network
  2. 02IAM
  3. 03Terraform
03

Migration method across platforms

AWS, Salesforce, SharePoint, Microsoft 365 and data migrations with mapping, validation and cutover planning, then Cloud Monitoring, Prometheus and Grafana after the move.

  1. 01Map
  2. 02Validate
  3. 03Cut over
04

A strategy per workload

Strategies are chosen workload by workload. We modernize, for example onto GKE, only where the business case supports it.

  • Lift and shift everything
  • A strategy per workloadRecommended
  • Rebuild everything first

What clients say about working with us

4.8/5

11 verified reviews on Clutch

Quality4.6
Schedule4.7
Cost4.7
Refer4.8
Read all reviews on Clutch (opens in a new tab)

Donan Consulting

“We’re most impressed by their technical expertise and problem-solving approach.”

Repeat support tickets fell by about 70%.

Josiane AlagbePresident · IT consulting firm, Maryland, USA
AbdoJeremy Winchell shares his experience with MoreYeahs

Flyersoft

“MoreYeahs has been a dependable partner, consistently providing strong Microsoft Dynamics 365 support.”

Abhinav ReddyHead of Account Management · Website testimonial
LyfeCoach TechnologiesLyfeCoach Technologies on working with MoreYeahs

AbdoReview summary

The team challenges requirements instead of just following user stories, and a client portal removed 60 to 70% of support cases.

Jeremy WinchellSr Manager of Data Analytics · Accounting and consulting firm, Minnesota, USA
TrivandiTrivandi on working with MoreYeahs

Acquiresoft SolutionsReview summary

A Dynamics CRM and SharePoint migration cut the reconciliation workload by 60%.

Dhejo ProthasisCo-Founder · IT consultancy, Virginia, USA
YonderYonder on working with MoreYeahs
Client testimonial

GCP migration services FAQs

Short answers below. For anything specific to your org, ask a Google Cloud Migration consultant.

Ask a consultant
01What are GCP migration services?

Planning and running the move of applications, VMs, databases and data to Google Cloud, with testing and optimization.

02What is Google Cloud migration?

Moving workloads from on-premises or another cloud to Google Cloud.

03How do businesses migrate applications to Google Cloud?

Assess, map dependencies, choose a strategy per app, prepare the target, migrate in waves and validate.

04Can on-premises infrastructure move to Google Cloud?

Yes, for example VMs to Compute Engine or VMware workloads to Google Cloud VMware Engine.

05What are the main strategies?

Rehost, replatform, refactor, repurchase, retire and retain.

06Which tools are used?

Migration Center, Migrate to Virtual Machines, Migrate to Containers, Database Migration Service and Storage Transfer Service, chosen per workload.

07How should we prepare?

Inventory your systems, map dependencies, clean your data, define security and pick pilot workloads.

08What are the common challenges?

Dependencies, compatibility, data integrity, bandwidth, downtime, security and cost control. Planning reduces the risk, but no migration is risk-free.

09How long does it take?

It depends on workloads, dependencies, data volume and testing. Small moves take weeks, large estates take months.

10What affects cost?

The number and complexity of workloads, data volume, modernization scope, testing and support. Google Cloud usage is billed separately.

11Can apps be modernized during migration?

Yes, for example by containerizing onto GKE or Cloud Run, where the business case supports it.

12What should we look for in a migration partner?

Delivered migrations, a clear method, security skills, verified credentials and post-migration support.

Discuss Your Google Cloud Migration

Tell us what you run today, what you want to move and any constraints. We will propose an assessment and wave plan.

  • Reply within one business day
  • Free 30-minute call
  • NDA before you share data