Skip to content

Azure Migration Services

Plan and execute your move to Microsoft Azure with a structured approach built around your workloads, infrastructure, security requirements and business goals. MoreYeahs' Azure migration services cover assessment, planning, environment preparation, migration in planned waves, testing, cutover and tuning, so your business keeps running while you migrate to Azure.

Trusted by teams in the USA, UK, Australia and India

  • Prometheus
  • Flyers Soft
  • Abdo
  • Supersourcing
  • TerraSecure
  • Devlabs Technology
  • Microsoft Solutions Partner
  • Salesforce ISV Partner
  • AWS Advanced Tier Services Partner
  • Google Cloud Partner
  • Zoho Authorized Partner
  1. Hybridcloud product migration with Azure workloads managed alongsideDiscovery, high-availability design, Terraform, CI/CD and cutover
  2. 8migration strategies, chosen per workloadFrom retire to replace, as set out in Microsoft's Cloud Adoption Framework
  3. 7Azure migration servicesFrom assessment to post-migration support
  4. 14checks before migrating to AzureOur pre-migration checklist

Workloads you can migrate to Azure

Not every workload should move as it is. Pick one to see what the move usually involves.

On-premise to Azure migration

Physical servers, virtualized environments and data centres moved to Azure. Some legacy systems need changes before they can move.

What we usually build

  • Infrastructure assessment and dependency mapping
  • Server and workload planning
  • Network connectivity, storage and data needs
  • Migration waves, testing and a post-migration review

Our Azure migration services

From the first assessment to support after cutover, with the right approach for each workload.

01

Azure for assessment

Workload discovery, dependencies, suitability, security, complexity and risk, plus a first roadmap of what to migrate, modernize, retain or retire.

Learn more
02

Azure for on-premise servers

Physical servers, virtualized environments and data centres, moved in planned waves with testing and a post-migration review.

03

Azure for applications

Compatibility, dependencies, configuration and integrations checked, then the application is tested and deployed on Azure.

04

Azure for databases

Source assessment, schema and data migration, validation, application connectivity and performance testing.

05

Azure for virtual machines

Server inventory, operating system review, compute and storage sizing, networking and performance checks.

06

Azure for data and storage

Transfer planning, permissions, storage design, integrity checks, and security and retention.

Learn more
07

Azure for post-migration support

Validation, monitoring, utilization reviews, security configuration, cost visibility and handover.

Learn more

Our Azure migration process

The stages we follow, with something you can see and test at the end of each.

Plan your project
  1. 01

    Discovery and workload assessment

    Infrastructure, applications, databases, dependencies and business priorities.

  2. 02

    Migration readiness and planning

    Suitability, complexity, security, target architecture and constraints, turned into priorities and a roadmap.

  3. 03

    Azure environment preparation

    Networking, compute, storage, identity and security for the target, often set up as a landing zone.

  4. 04

    Migration, testing and validation

    Approved workloads move wave by wave around their dependencies. Applications, data, connectivity, performance and security are then checked.

  5. 05

    Cutover and operational handover

    The production switch-over is planned around business windows and acceptance criteria, with rollback ready. We do not promise zero downtime.

  6. 06

    Post-migration optimization

    Performance, utilization, cost visibility, security and operational improvements. Scope and order vary by project.

What your migrated workloads land on

Azure works best when it shares data with the systems around it.

  • Azure landing zone
  • Networking
  • Compute
  • Storage
  • Identity and access
  • Security
  • Monitoring
  • Terraform
  • CI/CD pipelines
  • AWS, in a hybrid setup

Why MoreYeahs for Azure Migration Services

A partner that delivers, then stays to support what it built.

01

Related migrations

Migrations we have delivered: a product moved to a high-availability cloud architecture with Terraform, containers and CI/CD while we managed Azure workloads alongside, SharePoint on-premises to SharePoint Online, Lotus Notes to Microsoft 365, and a large data migration with controlled cutover.

  • Hybrid cloud
  • SharePoint Online
  • Microsoft 365
  • Data cutover
02

Workload-first planning

Suitability and dependencies decide the order and the strategy for each workload.

  • Move everything as it is
  • A strategy per workloadRecommended
  • Rebuild everything first
03

Applications, infrastructure and data together

One team across all three, with identity, access and data integrity planned in from the start.

  1. 01Applications
  2. 02Infrastructure
  3. 03Data
04

Validated, then run

Testing before cutover and tuning after. We also operate Azure and AWS workloads for managed IT clients.

  1. 01Test
  2. 02Cut over
  3. 03Tune

What clients say about working with us

4.8/5

11 verified reviews on Clutch

Quality4.6
Schedule4.7
Cost4.7
Refer4.8
Read all reviews on Clutch (opens in a new tab)

Donan Consulting

“We’re most impressed by their technical expertise and problem-solving approach.”

Repeat support tickets fell by about 70%.

Josiane AlagbePresident · IT consulting firm, Maryland, USA
AbdoJeremy Winchell shares his experience with MoreYeahs

Flyersoft

“MoreYeahs has been a dependable partner, consistently providing strong Microsoft Dynamics 365 support.”

Abhinav ReddyHead of Account Management · Website testimonial
LyfeCoach TechnologiesLyfeCoach Technologies on working with MoreYeahs

AbdoReview summary

The team challenges requirements instead of just following user stories, and a client portal removed 60 to 70% of support cases.

Jeremy WinchellSr Manager of Data Analytics · Accounting and consulting firm, Minnesota, USA
TrivandiTrivandi on working with MoreYeahs

Acquiresoft SolutionsReview summary

A Dynamics CRM and SharePoint migration cut the reconciliation workload by 60%.

Dhejo ProthasisCo-Founder · IT consultancy, Virginia, USA
YonderYonder on working with MoreYeahs
Client testimonial

Questions about Azure Migration Services

Short answers below. For anything specific to your org, ask a Azure Migration Services consultant.

Ask a consultant
01What are Azure migration services?

Services that assess, plan, move and validate workloads moving to Microsoft Azure, from servers and virtual machines to applications, databases and file storage.

02How do I migrate my business to Azure?

Assess what you run, pick a strategy per workload, prepare the Azure environment, migrate in waves, test, cut over and optimize.

03What is on-premise to Azure migration?

Moving servers, applications and data from your own data centre or office servers to Azure.

04Which workloads can move to Azure?

Most servers, web applications, databases and file workloads, subject to compatibility, licensing and dependencies. Some are better modernized, replaced, retired or kept on-premises in a hybrid setup.

05What are the main stages of an Azure migration?

Discovery, planning, environment preparation, migration, testing, cutover and optimization.

06What migration strategies are there?

Retire, retain, rehost, replatform, refactor, rearchitect, rebuild and replace, chosen per workload. The right mix depends on goals, dependencies, cost, risk and feasibility.

07How do I prepare? Is there an Azure migration checklist?

Work through an Azure migration checklist: scope, dependencies, compatibility, data volumes, security and access, data residency, network bandwidth, target architecture, running costs, backup and recovery, testing, migration waves, rollback and post-migration support.

08How much do Azure migration services cost?

It depends on the number and complexity of workloads, data volumes, application changes, the target architecture, security needs, testing and cutover support. Azure running costs are separate from migration fees, so budget for both.

09How long does it take to migrate to Azure?

From weeks for a few simple workloads to months for large estates. An assessment sets a realistic timeline.

10What are the common challenges?

Compatibility, hidden dependencies, data volume, security, sizing, disruption and post-migration tuning. Early assessment, test transfers, rehearsed cutovers and rollback plans reduce the risk, though they cannot remove all of it.

11How do I choose an Azure migration partner?

Check similar experience, assessment depth, architecture and security skills, testing practice, cost planning and support, and verify any credentials. MoreYeahs does not claim a Microsoft partner designation for Azure migration.

12What should we do after migrating?

Monitor, rightsize, review security and costs, update documentation and decommission old systems.

Start planning your Azure migration

Tell us about your current infrastructure or platform and what you want to move. We will scope an assessment and outline a migration plan.

  • Reply within one business day
  • Free 30-minute call
  • NDA before you share data