Skip to content

Microsoft Power Apps Development Services

If your teams still track requests in spreadsheets, approve work by email or carry paper forms into the field, Microsoft Power Apps can replace them with apps that fit how they work. Our Power Apps development services cover low code app development from scoping to a governed handover: canvas or model-driven apps on Dataverse or SharePoint, connected with Power Automate.

Trusted by teams in the USA, UK, Australia and India

  • Prometheus
  • Flyers Soft
  • Abdo
  • Supersourcing
  • TerraSecure
  • Devlabs Technology
  • Microsoft Solutions Partner
  • Salesforce ISV Partner
  • AWS Advanced Tier Services Partner
  • Google Cloud Partner
  • Zoho Authorized Partner
  1. Offlinecanvas app for technicians at remote sitesMining company, Australia
  2. Retailmodel-driven apps on Dataverse for store sales and customer engagementRetail chain, India
  3. AIassisted invoice claims validation with Power AutomateInsurance company, Australia
  4. 2app types we build: canvas and model-drivenOn Dataverse or SharePoint

Low-Code App Development with Microsoft Power Apps

Low code app development means building apps mostly with visual tools, configuration and short formulas. Low-code is not no-code: good apps still need design, data modelling, testing, security and governance.

Canvas apps

Apps where the user experience matters most. They start from the screen design and can use many data sources.

What we usually build

  • Employee and field data collection apps
  • Inspections with photos
  • Internal requests and tracking
  • Offline use for remote work

Our Power Apps Development Services

Power Apps consultants who scope, build, connect and support your apps.

01

Power Apps Development consulting

Use-case selection, a review of your systems and data, the right app type and data source, and a clear scope.

02

Power Apps Development and testing

Screens, forms, business rules, logic and connected data, tested against agreed requirements.

03

Power Apps Development for canvas apps

Employee apps, field data collection, inspections and request tracking, including offline use.

04

Power Apps Development for model-driven apps

Data-first apps on Dataverse for structured processes and department operations.

05

Power Apps Development on Dataverse

Tables, relationships, business rules, security roles and links to Dynamics 365 data.

06

Power Apps Development on SharePoint

Apps on SharePoint lists and libraries for requests, approvals and other simpler needs.

Learn more
07

Power Apps Development and integration

Microsoft 365, Power Automate, Dynamics 365, Azure and external APIs through connectors or custom connectors.

08

Power Apps Development support and optimization

Updates, performance tuning, fixes, connector maintenance and changes based on user feedback.

Our Power Apps Development Process

The stages we follow, with something you can see and test at the end of each.

Plan your project
  1. 01

    Discover and assess fit

    Users, process and goals, then whether Power Apps fits your licences and limits. You get a requirement summary and a go or no-go.

  2. 02

    Map users and workflow

    Who does what, where and on which device, written up as user journeys.

  3. 03

    Plan data and integrations

    Dataverse, SharePoint or other sources, and the connectors needed, set out in a data plan.

  4. 04

    Design and build

    App type, screens and security roles agreed in a design or prototype, then built in a development environment.

  5. 05

    Automate and test

    Power Automate flows and connectors, then functional, offline, security and user acceptance testing.

  6. 06

    Deploy and support

    A managed solution moved to production with guides and training, plus optimization and support where agreed.

Power Apps Integration with the Microsoft Ecosystem

Power Apps Development works best when it shares data with the systems around it.

  • Dataverse
  • SharePoint
  • Power Automate
  • Microsoft 365
  • Dynamics 365
  • Power BI
  • Azure
  • Custom connectors and APIs

Why MoreYeahs for Power Apps Development

A partner that delivers, then stays to support what it built.

01

Power Apps in real projects

Model-driven apps for a retail chain, an offline canvas app for remote field work and an AI-assisted claims app for an insurer.

  • Retail, India
  • Mining, Australia
  • Insurance, Australia
  • Canvas
  • Model-driven
02

Governed delivery

Solutions, environments, security roles and documentation, so IT can govern the app after handover.

  1. 01Solutions
  2. 02Environments
  3. 03Handover
03

Microsoft skills

Dataverse, Dynamics 365, SharePoint, Power Automate and Power BI around your apps.

  1. 01Dataverse
  2. 02Power Automate
  3. 03Power BI
04

Requirements first

We check whether Power Apps is the right tool before building. Neither Power Apps nor custom code is always cheaper or faster.

  • Power Apps for everything
  • Check the fit, then buildRecommended
  • Custom code for everything

What clients say about working with us

4.8/5

11 verified reviews on Clutch

Quality4.6
Schedule4.7
Cost4.7
Refer4.8
Read all reviews on Clutch (opens in a new tab)

Donan Consulting

“We’re most impressed by their technical expertise and problem-solving approach.”

Repeat support tickets fell by about 70%.

Josiane AlagbePresident · IT consulting firm, Maryland, USA
AbdoJeremy Winchell shares his experience with MoreYeahs

Flyersoft

“MoreYeahs has been a dependable partner, consistently providing strong Microsoft Dynamics 365 support.”

Abhinav ReddyHead of Account Management · Website testimonial
LyfeCoach TechnologiesLyfeCoach Technologies on working with MoreYeahs

AbdoReview summary

The team challenges requirements instead of just following user stories, and a client portal removed 60 to 70% of support cases.

Jeremy WinchellSr Manager of Data Analytics · Accounting and consulting firm, Minnesota, USA
TrivandiTrivandi on working with MoreYeahs

Acquiresoft SolutionsReview summary

A Dynamics CRM and SharePoint migration cut the reconciliation workload by 60%.

Dhejo ProthasisCo-Founder · IT consultancy, Virginia, USA
YonderYonder on working with MoreYeahs
Client testimonial

Questions about Power Apps Development

Short answers below. For anything specific to your org, ask a Power Apps Development consultant.

Ask a consultant
01What is Microsoft Power Apps?

Microsoft's low-code platform for building business apps with visual tools, connectors and Dataverse. It is part of Microsoft Power Platform.

02What do Power Apps development services include?

Consulting, app design and build, Dataverse or SharePoint data, integrations, testing, deployment and support.

03What does a Power Apps consultant do?

Identifies suitable processes, chooses the app type and data source, designs and builds the app, and sets up governance.

04What can be built with Power Apps?

Request, approval, inspection, tracking, onboarding and other internal business apps, including offline mobile apps.

05What is low-code app development?

Low code app development means building apps mainly with visual tools and short formulas rather than large amounts of code. Power Apps is Microsoft's platform for it.

06Is Power Apps suitable for enterprise applications?

For many internal and process apps, yes, with good data design and governance. Very complex or high-volume systems may need custom development.

07What is the difference between canvas and model-driven apps?

Canvas apps start from a custom screen design and can use many data sources. Model-driven apps start from Dataverse data and give a standard layout.

08Power Apps vs custom app development: which is right?

Power Apps is quicker for suitable workflow apps. Custom development gives full control for specialized or complex products. The right choice depends on the requirement.

09Can Power Apps connect to SharePoint and Dataverse?

Yes. Both are common data sources for Power Apps.

10Can Power Apps integrate with Dynamics 365?

Yes. Both use Dataverse, so apps can work with Dynamics 365 data directly.

11Does Power Apps require coding?

Little for many apps, but formulas, data design and sometimes custom code are needed.

12What are the limitations of Power Apps?

Platform controls limit some user experiences, some connectors need premium licences, and very large data or complex logic can need extra architecture.

13How much does Power Apps development cost?

It depends on the number of screens and workflows, data sources, integrations, offline needs, security and testing.

14Does Power Apps need a separate licence?

Some use comes with Microsoft 365. Dataverse and premium connectors need Power Apps licences. Check Microsoft's current plans.

15How can MoreYeahs help?

By assessing your process, choosing the right app type, building and testing the app, and training your team.

Replace Spreadsheets and Email Approvals with Power Apps

Tell us the process, who uses it, your Microsoft environment and any systems the app must connect to. We will recommend the right Power Apps approach.

  • Reply within one business day
  • Free 30-minute call
  • NDA before you share data